Sample design · This website is a demo, made to show what your business site could look like. The company, people and reviews on it are not real. · This website is a demo. The business is not real.

Built by Prebuiltwebmarket.com
Talk to the shop(720) 555-0185Book an energy audit

Boulder County, seven days a week for emergencies. Demo site with sample content.

What we install

One crew for the envelope, the mechanicals and the array, so the numbers actually add up.

See all eight solutions

Work out your own numbers

Every tool here runs in your browser on figures you can change. Nothing is emailed to us.

Open the full index

The people doing the work

Eleven people, one warehouse on Pearl Parkway, and a service radius we can drive in under an hour.

Meet the crew

Solutions

Solar-ready roofing

Reroof and array in one mobilisation, so you never pay to remove a five-year-old system to replace shingles under it.

Class 4 architectural shingle
$6.40 to $9.20 per sq ft
Standing seam metal
$14.00 to $21.00 per sq ft
Combined saving
$2,400 to $4,100
Solar-ready roofing by GreenLeaf Home Energy in Boulder CountySolar-ready roofing

How we think about it

Solar-ready roofing, in plain terms

If your covering has fewer than eight years of service life left, putting an array on it is a scheduling decision you will regret. Removing and reinstalling a 7 kW array to reroof underneath runs $1,800 to $3,200 (sample), plus the production you lose while it sits on the driveway.

Doing both at once is cheaper than doing them two years apart. One mobilisation, one set of scaffolding, one permit cycle, and the mounting feet get flashed into fresh underlayment by the people who laid it. Boulder County hail means impact-rated Class 4 shingles are worth the premium here, and several insurers discount the policy for them.

We also fix the things a reroof is the only chance to fix: ventilation that never worked, valley detailing, and the penetration layout that decides whether your array is a clean rectangle or an awkward stagger around three plumbing vents.

On the quote, not in a change order

What is included

  • Tear-off, deck inspection and sheathing repair where needed
  • Ice and water shield at eaves and valleys to Boulder County detail
  • Class 4 impact-rated architectural shingles, or standing seam metal with clamp mounting
  • Ridge and soffit ventilation corrected and balanced
  • Plumbing vent relocation where it unlocks a clean array layout
  • Array mounting feet flashed into new underlayment by the roofing crew
  • Combined permit and a single inspection sequence
  • One warranty conversation: roofing and solar under one contractor

Start to finish

How the work runs

  1. 01

    Roof assessment

    Covering type, remaining life, deck condition, ventilation and the penetration map.

  2. 02

    Combined design

    The array layout is drawn before the roof is torn off, so vents and flashing land where the modules are not.

  3. 03

    Reroof

    One to three days depending on squares and pitch. Mounting feet and flashing go in as part of the roof, not after it.

  4. 04

    Array

    Rails, modules, conduit and inverter follow immediately, usually the same week.

Why it is worth doing

Three things you get that a cheaper quote will not give you

  • 01

    Never pay twice

    No removal and reinstall bill in year five, and no lost production while the array sits on the ground.

  • 02

    Better flashing

    Feet bedded into new underlayment by the roofers, not retrofitted through a weathered shingle.

  • 03

    Hail-appropriate

    Class 4 impact rating is the sensible default on the Front Range, and it often earns an insurance discount.

Asked on nearly every visit

Questions about this work

More on the questions page, or call the shop and ask a person.

On standing seam, yes. Seam clamps grip the rib and carry the rails with zero roof penetrations, which is the cleanest array mounting available.

Both are workable. Tile needs tile-replacement flashings and slows the install by a day or two; wood shake usually fails the fire and insurance conversation in Boulder County before it gets to solar.

The covered area actually weathers more slowly, since it is shaded from UV and hail. The risk is entirely in the flashing detail, which is why we prefer to install both.

Two documents, one contractor. The shingle manufacturer warrants the covering, we warrant the workmanship on both trades for ten years, and there is nobody to point at if water appears.

Start with the test, not the quote

Three to four hours on site, a written report in five business days, and a recommendation that might well be to spend less than you planned.

Cookie preferences

Choose which cookies you allow. You can change this at any time from the link in the footer.